From ground-break to handover
Construction
On a construction site, position is quality. SEC provides the control, setting-out, verification and documentation that compare what is built against what was designed — from the first benchmark to the final digital record.
Sector challenges
What goes wrong when measurement waits
Setting-out errors compound
A misplaced gridline travels through foundations, structure and finishes — found late, it is expensive.
Unknown existing conditions
Levels, structures and buried services that differ from the tender drawings surface as claims and delay.
Progress disputes
Without measured records, progress and quantities become negotiation instead of fact.
Handover without evidence
Closing a project needs as-built documentation of what was actually built.
Project lifecycle
The construction measurement cycle
Survey is not a mobilization task that ends at ground-break — it runs the length of the project.
01
Pre-construction
Baseline mapping and data gathering that anchor the contract to the real site.
02
Site control
Benchmarks and control networks established and protected for the project's life.
- Control Networks & Benchmarks
- CORS Network & RTK Services
03
Existing conditions
Topographic survey and utility detection before the first excavation.
- Topographic Survey
- Underground & Subsurface Detection
04
Setting-out
Gridlines, foundations, structures and services positioned from design geometry.
- Construction Survey
- GNSS / RTK Survey
05
Progress verification
Periodic capture of the works — surfaces, volumes and completion measured, not estimated.
- UAV & Aerial Survey
- Engineering Survey
06
QA/QC survey
Dimensional checks against tolerance before work is covered or built upon.
- Engineering Survey
07
Reality capture
Laser scanning of built stages — a permanent measurable record of what exists.
- LiDAR & Reality Capture
- Terrestrial Laser Scanning
08
As-built & final digital records
As-built surveys, 3D documentation and structured data handed over at closeout.
- 3D Documentation
- GIS & Geospatial Solutions
Technology approach
Measurement that keeps pace with the site
Network RTK on site
Crews position against the CORS network — shared control from network RTK corrections.
Scan-based verification
Point clouds compared against design geometry make deviations visible while they are still correctable.
Site data, organized
Survey records, progress surfaces and QA checks structured so the project record shows what was measured and when.
Field equipment
Leica Geosystems
Leica FlexLine TS07
A total station of the type used on engineering and construction survey scopes.
Leica Geosystems
Leica DNA03 Digital Level
A digital level of the type used on vertical control and repeat height scopes.
What you receive
Records the contract can stand on
- Site control schedules and benchmark records
- Existing-condition and pre-work surveys
- Setting-out data and reports
- Progress surfaces and quantity computations
- QA/QC dimensional check reports
- Stage point clouds and scan records
- As-built drawings and digital handover data
Build on verified position, not assumption.
Whether you need a control network, a survey crew through execution, or as-built documentation at closeout — SEC can scope it to your programme.